Project: All Waste Services – AWS Llangadog
Project value: £15,000
Project Completion: 2006
Description of Work:
- Carry out electrical installation within the new work sheds, to include high bay lighting and 3phase distribution points.
- Install flood lighting over external yard.
- Carry out the installation of the electrical processing equipment for paper shredding, along with their conveyors.
- Carry out the installation of a 200kva generator, include the installation of a new control panel